# Programme ## Hierarchy (§43) ``` Initiative → Epic → Capability → Story → Engineering task/subtask ``` ## Initiatives | ID | Initiative | Outcome | |---|---|---| | I-01 | Publishing Core | Owner can publish a real site | | I-02 | Extensibility Platform | Themes/features add cleanly | | I-03 | Administration | Meaningful site behaviour is editable | | I-04 | Visitor Personalisation | Owner-controlled visitor preferences | | I-05 | Operational Simplicity | Install/upgrade/backup are predictable | | I-06 | Extension Ecosystem | Reading, RSS, themes and later capabilities | ## Initiative → epic map (editorial primary mapping) - **I-01** — E02, E03, E04, E06, E07, E08, E09, E10, E29, E30, E31 - **I-02** — E11, E12, E13, E14, E15, E16 - **I-03** — E05, E19 - **I-04** — E17, E18 - **I-05** — E00, E01, E20, E21, E22, E23, E24, E25, E26 - **I-06** — (future v0.2/v0.3 scope; no v1 epics) ## Numbering scheme ``` Initiative I-01 … I-06 Epic E00 … E31 Story E-S e.g. E00-S01 Task/Card E-S-T e.g. E00-S01-T01 Epic-level task (no stories) E-T (only E26) ``` ### Numbering reconciliation (v1.1) v1.0 uses epic IDs `E00`–`E26`. The v1.1 amendment (§52-A) reused `E26`–`E28` for the new Sprint M epics, colliding with Sprint 7's `E26`. Because v1.1 is additive ("adds, does not delete"), v1.0 IDs stay unchanged and Sprint M epics receive fresh IDs: - Sprint M "media pipeline" (§52-A `E26`) → **E29** - Sprint M "embeds" (§52-A `E27`) → **E30** - Sprint M "native charts and diagrams" (§52-A `E28`) → **E31** Their stories renumber accordingly (e.g. `E26-S01` → `E29-S01`). `E27`/`E28` are retired. ## Requirements treated as confirmed (§2.1) Home + individual posts; Amber ("Node") initial appearance; everything meaningful editable; plugin/extension-oriented; themes as extensions; owner may later permit visitor theme choice; visitor choice remembered in browser/session; deployment extremely simple; Docker Compose preferred; delivery in epics/stories/sprints/acceptance criteria; fast demo without irreversible shortcuts. **v1.1 restored:** Markdown authoring (13.1); rich media (29.1–29.4); external graph/diagram embeds (29-A); page metadata (34-A). ## Proposed defaults requiring sign-off (§2.2) OD-01 two-week sprints after Sprint 0 · OD-02 Sprint 0 = one week · OD-03 one site per installation · OD-04 one administrator · OD-05 admin idle timeout 12h / absolute 7d · OD-06 anonymous preference retention 365d · OD-07 local filesystem media storage · OD-08 `/posts/:slug` canonical route · OD-09 soft delete · OD-10 build-time trusted extensions · OD-11 Vite modern-browser baseline · OD-12 amd64+arm64 · OD-13 (v1.1) Markdown via `core.markdown` · OD-14 (v1.1) seed embed allowlist. OD-03/04/08/09 need explicit product sign-off before semantics freeze. ## Definition of Ready / Done See [engineering-standards.md](engineering-standards.md) (§44/§45).