CI / Stage 1 — Frozen lockfile install (E00-S05-T01) (pull_request) Successful in 46s
CI / Stage 2 — Typecheck (E00-S05-T01) (pull_request) Successful in 1m15s
CI / Stage 3 — Formatting/lint policy (E00-S05-T01) (pull_request) Successful in 44s
CI / Stage 4 — Unit tests (E00-S05-T01) (pull_request) Successful in 1m44s
CI / Stage 5 — Architecture tests (E00-S05-T01) (pull_request) Failing after 56s
CI / Stage 6 — PostgreSQL integration tests (E00-S05-T01) (pull_request) Skipped
CI / Stage 7 — Build the admin and server applications (E00-S05-T01) (pull_request) Skipped
The non-container guide now covers pnpm lint (the formatting/lint policy) in the Test and clean-clone smoke sections and describes the ordered PR CI stages locked in by tests/ci-stages.test.mjs.