[E00-S05-T01] Implement CI quality baseline (required PR stages) #405

Merged
kpcto merged 7 commits from feature/187 into main 2026-08-31 00:07:03 +00:00
7 Commits
Author SHA1 Message Date
implementer 10ea1ef3db test: lock in the action SHA pins and workflow-level permissions with the ci-stages suite (E00-S05-T01)
CI / Stage 1 — Frozen lockfile install (E00-S05-T01) (pull_request) Successful in 4m11s
CI / Stage 2 — Typecheck (E00-S05-T01) (pull_request) Successful in 1m24s
CI / Stage 3 — Formatting/lint policy (E00-S05-T01) (pull_request) Successful in 51s
CI / Stage 4 — Unit tests (E00-S05-T01) (pull_request) Successful in 1m49s
CI / Stage 5 — Architecture tests (E00-S05-T01) (pull_request) Successful in 4m2s
CI / Stage 6 — PostgreSQL integration tests (E00-S05-T01) (pull_request) Successful in 1m15s
CI / Stage 7 — Build the admin and server applications (E00-S05-T01) (pull_request) Successful in 1m43s
- assertHardening: every uses: ref is a full 40-char commit SHA equal to the
  committed PINNED_ACTIONS table (no floating tags) and the workflow declares
  a top-level permissions: contents: read block
- mutation probes: reverting a pin to @v4, swapping a pinned SHA or removing
  the permissions block all fail
2026-08-30 06:29:43 +00:00
implementer d0c3b6a83d ci: pin third-party actions to full commit SHAs and declare minimal workflow permissions (E00-S05-T01)
- actions/checkout pinned to 11bd71901bbe5b1630ceea73d27597364c9af683 (v4.2.2)
- actions/setup-node pinned to 1d0ff469b7ec7b3cb9d8673fde0c81c44821de2a (v4.2.0)
- workflow-level permissions: contents: read (the pipeline only reads the repo)
- no floating @v4 tags remain anywhere in the workflow
2026-08-30 06:29:43 +00:00
implementer 13b1548df8 ci: build the config and database-postgres packages before the architecture suites (E00-S05-T01)
CI / Stage 1 — Frozen lockfile install (E00-S05-T01) (pull_request) Successful in 53s
CI / Stage 2 — Typecheck (E00-S05-T01) (pull_request) Successful in 1m33s
CI / Stage 3 — Formatting/lint policy (E00-S05-T01) (pull_request) Successful in 1m20s
CI / Stage 4 — Unit tests (E00-S05-T01) (pull_request) Successful in 2m46s
CI / Stage 5 — Architecture tests (E00-S05-T01) (pull_request) Successful in 4m55s
CI / Stage 6 — PostgreSQL integration tests (E00-S05-T01) (pull_request) Successful in 1m22s
CI / Stage 7 — Build the admin and server applications (E00-S05-T01) (pull_request) Successful in 1m22s
The strict-tsconfig suite typechecks apps/server with tsc --noEmit, which
resolves @personal-blog/config and @personal-blog/database-postgres through
their compiled dist/ type declarations. On a fresh checkout dist/ does not
exist, so the architecture stage must build those two packages first (the
same prerequisite the unit and postgres-integration stages already declare).
2026-08-30 06:22:26 +00:00
implementer f3cd70e45d docs: document the lint command and the CI quality baseline stages (E00-S05-T01)
CI / Stage 1 — Frozen lockfile install (E00-S05-T01) (pull_request) Successful in 46s
CI / Stage 2 — Typecheck (E00-S05-T01) (pull_request) Successful in 1m15s
CI / Stage 3 — Formatting/lint policy (E00-S05-T01) (pull_request) Successful in 44s
CI / Stage 4 — Unit tests (E00-S05-T01) (pull_request) Successful in 1m44s
CI / Stage 5 — Architecture tests (E00-S05-T01) (pull_request) Failing after 56s
CI / Stage 6 — PostgreSQL integration tests (E00-S05-T01) (pull_request) Skipped
CI / Stage 7 — Build the admin and server applications (E00-S05-T01) (pull_request) Skipped
The non-container guide now covers pnpm lint (the formatting/lint policy) in
the Test and clean-clone smoke sections and describes the ordered PR CI
stages locked in by tests/ci-stages.test.mjs.
2026-08-30 06:12:25 +00:00
implementer 89fe0b52e6 ci: run the required PR quality stages in order (E00-S05-T01)
Restructure .gitea/workflows/ci.yml from a flat list of per-suite jobs into
the ordered stage baseline: frozen install -> typecheck -> formatting/lint ->
unit -> architecture -> PostgreSQL integration -> build of the admin and
server applications. Each stage gates on its predecessor through needs, so
the frozen install runs before every later stage and the pipeline halts on
the first failing stage. The docker-gated real-stack probes in the
postgres-integration (and container) suites keep running where a Docker
daemon is available and skipping cleanly otherwise.
2026-08-30 06:12:25 +00:00
implementer d9b493498e test: lock in the CI quality baseline stage order with the ci-stages suite (E00-S05-T01)
tests/ci-stages.test.mjs asserts that .gitea/workflows/ci.yml declares the
seven required PR stages (frozen-install, typecheck, formatting-lint, unit,
architecture, postgres-integration, build-apps) in order, that every later
stage gates on its predecessor through needs, that each stage runs its
expected command (frozen install, pnpm typecheck, pnpm lint, the unit /
architecture / postgres-integration node --test runs, the apps-group build
with the server artifact check), and that every committed test suite is
wired into exactly one stage. Mutation probes prove the assertions are
non-vacuous.
2026-08-30 06:12:25 +00:00
implementer e6d28f94f0 feat: add dependency-free formatting/lint policy suite and root lint script (E00-S05-T01)
The formatting-policy suite (tests/formatting-policy.test.mjs) locks in the
workspace formatting and lint policy: LF line endings, no BOM, no trailing
whitespace, no tab indentation, exactly one final newline, and valid JSON
with 2-space indentation and no duplicate keys. Every rule has a mutation
probe. The root `lint` script runs the suite; the CI formatting-lint stage
executes it.
2026-08-30 06:12:25 +00:00